The project has pretty much been stalled until we get 2-3 days of 45 degree weather with NO precipitation (i.e.-snow, rain, sleet). So pray, meditate, do a non-snow or rain dance to keep the precip away and allow the sun to come and warm the earth!
They are waiting for this kind of weather so they may shingle the roof. Until that is done they cannot insulate and sheetrock, etc the interior of the building. The windows should be installed soon though but that is about all until we get a warm period.
Thursday, March 10, 2011
Monday, February 7, 2011
Check it out!
We were in Sunday's edition of the paper! Library Extreme Makeover!
http://www.syracuse.com/news/index.ssf/2011/02/morrisville_library_gets_a_mak.html
http://www.syracuse.com/news/index.ssf/2011/02/morrisville_library_gets_a_mak.html
Friday, January 14, 2011
We have trusses....the roof will be soon! :-)
Friday, January 7, 2011
We have WALLS!!!
Tuesday, December 21, 2010
Snow has arrived, the project has slowed
Hi All-
I am sure you are wondering where the new pictures are! Well the last couple weeks and the lake effect snow has slowed things a bit. Until yesterday not much has happened due to the snow. We do have steel columns being put in place now and walls to be erected hopefully next week!
Our new floor buried in snow (above)!
Despite the snow, window trim, doors, and siding colors are being looked at as well as shingle color and downspouts, etc. Soon interior colors will be chosen, things are moving along, just not obvious to a passerby's eye.
I am sure you are wondering where the new pictures are! Well the last couple weeks and the lake effect snow has slowed things a bit. Until yesterday not much has happened due to the snow. We do have steel columns being put in place now and walls to be erected hopefully next week!
Our new floor buried in snow (above)!
Despite the snow, window trim, doors, and siding colors are being looked at as well as shingle color and downspouts, etc. Soon interior colors will be chosen, things are moving along, just not obvious to a passerby's eye.
Monday, November 29, 2010
WE HAVE A FLOOR!!!!
Today was an exciting day at the library as they poured the slab for the floor! Check out the slideshow pics of this exciting event! :-)
Tuesday, November 23, 2010
We got a footprint!!!
If you haven't been following the slideshow to the right, you should! You can see the almost daily pictures of the project there and we now know what shape the building will look like!
They are hoping to pour the concrete slab any day now, weather permitting of course! Watch for new pics of that to come soon!
If you are on facebook look us up! Morrisville Public-Library as pictures are added there as well!
Thank you for bearing with us during this exciting time!
They are hoping to pour the concrete slab any day now, weather permitting of course! Watch for new pics of that to come soon!
If you are on facebook look us up! Morrisville Public-Library as pictures are added there as well!
Thank you for bearing with us during this exciting time!